Issuer

Legal nameCORE SCIENTIFIC, INC.
HQUnited States (US)
ListingUS CORZ
ISINUS21874A1060
SectorTechnology
IndustryBlockchain & Cryptocurrency
SIC6199
CurrencyUSD
Entity registrysec:0001839341
CIK0001839341
Employees325
AddressCore Scientific, Inc. 838 Walker Road 19904, Dover
Headline financial metrics
Revenue$440.3M
Operating income$-388.9M
Net income$-1.4B
Free cash flow$-723.3M
Operating margin-88.3%
Net margin-313.9%
PeriodTTM 2026-06-30
Loading chart…

OpenFilings analyst

Our analyst

Agentic read of the latest earnings call — recommendation updates when we process a new transcript. Research synthesis, not investment advice.

Strong contracted growth, but leverage, financing execution, concentration and uncontracted expansion options remain material.

Latest call · Q2 2026

Core Scientific’s AMD agreement materially strengthens its AI-infrastructure backlog:

530 MW across five sites, more than $14 billion of base contracted revenue over 15 years, and 1.1 GW of total contracted billable capacity worth over $24 billion. However, the initial AMD buildout requires roughly $6 billion of capex against $1.8 billion of liquidity and depends on project-level bond financing, while much of the growth remains concentrated in AMD and CoreWeave; the risk/reward is attractive but not yet a clean buy.

Themes
  • Amd Partnership
  • Coreweave Colocation
  • Ai Infrastructure
  • Contracted Capacity
  • Project Financing
  • Bitcoin Mining Winddown
+2

Near term

CoreWeave billing reached 437 MW in mid-July, nearly 200 MW above Q1, with management expecting another meaningful colocation revenue increase in Q3.

Project-level bond financing terms and availability will determine whether the approximately $6 billion AMD buildout can proceed without substantial equity dilution or balance-sheet strain.

Pecos is scheduled for initial AMD megawatt delivery in the first half of 2027; delays or cost escalation would likely pressure the shares.

Bitcoin mining is being wound down, reducing exposure to mining volatility but also removing a source of operating activity and potentially increasing reliance on colocation execution.

Longer term

The AMD relationship includes an exclusive reservation right for up to an additional 2 GW, but this is an option rather than contracted revenue and depends on incremental grid-connected and behind-the-meter power.

The company is targeting a repeatable multi-site deployment model at estimated build costs of $11 million-$12 million per MW; sustained cost control and commissioning performance are central to the thesis.

Customer concentration remains significant: AMD and CoreWeave each have committed more than 500 MW, making credit quality, renewal economics and customer technology decisions important long-term risks.

The proposed pipeline of more than 2 GW of incremental power is not expected to become available until late 2028-2030, leaving a long duration between investment and potential monetization.

Red flags

The call provided no explicit guidance for revenue, margins, EPS or cash flow, limiting near-term valuation discipline.

The $6 billion AMD capex requirement is more than three times current liquidity, and management did not quantify expected project-level debt pricing, leverage, covenants or equity funding needs.

The $14 billion AMD figure is base contracted revenue, but the economics of the AMD warrant and the modified-gross lease supporting a neocloud were not quantified.

Management emphasized expansion potential and reservation rights, but the additional 2 GW and the broader 2 GW site pipeline remain contingent and uncontracted.

No analyst Q&A was provided, so there was no pushback on competitive displacement, AMD platform adoption, customer concentration or financing risk.

OpenFilings analyst view from primary-source filings and earnings calls — not investment advice.

From latest 10-K · 2026-03-02

  • Sbc Revenue High
  • Net Margin Sharply Negative
  • Cash Runway Low

Red flags

  • Sbc Revenue High — SBC/Revenue 30.8%
  • Net Margin Sharply Negative — Net margin -88.0%
  • Cash Runway Low — Cash runway ~0.7 years

Upcoming earnings

1 event
2:30 PM UTC+2
Period
Sep 2026
Est. EPS
$0.00
Est. revenue
193.8M

Earnings transcripts

4 recent

Documents

FormReporting forFiledFlags
2026-10-122026-10-140
2026-10-052026-10-070
2026-10-012026-10-050
2026-10-012026-10-050
2026-09-282026-09-300