Operating and Financial Review
Operating and Financial Review
continued
Annual Mineral Resources Statement
Mineral Resources as at 30 June 2026 Mineral Resources as at 30 June 20251
JORC Code Tonnes Grade WO Tonnes Grade WO
3 3
Orebody Category (Mt) (% WO ) (mtu) (Mt) (% WO ) (mtu)
3 3
In-Situ Indicated 17.34 0.280 4,935,823 18.06 0.30 5,405,901
Inferred 10.64 0.300 3,201,048 10.68 0.30 3,217,311
Subtotal 28.00 0.290 8,136,871 28.74 0.30 8,623,212
LGSP Indicated 9.38 0.075 703,546 10.126 0.075 759,450
Inferred 2.58 0.070 167,696 – – –
Inferred 0.83 0.060 53,318 – – –
Subtotal 12.80 0.070 924,559 10.126 0.075 759,450
TOTAL 40.80 0.220 9,061,430 38.87 0.23 9,382,662
Annual Ore Reserves Statement
Ore Reserves as at 30 June 2026 Ore Reserves as at 30 June 2025
Contained Contained
Tonnes WO WO Tonnes WO WO
3 3 3 3
JORC Code Category (Mt) (%) (mtu) (Mt) (%) (mtu)
Open Cut - Proved – – – – – –
Open Cut - Probable 4.47 0.32% 1,417,202 5.21 0.28% 1,459,735
Open Cut - Total 4.47 0.32% 1,417,202 5.21 0.28% 1,459,735
LGSP - Proved – – – – – –
LGSP- Probable 9.38 0.08% 703,546 9.59 0.075% 719,030
LGSP - Total 9.38 0.08% 703,546 9.59 0.075% 719,030
All - Total 13.85 0.15% 2,120,748 14.80 0.147% 2,178,765
Notes:
1 The Mineral Resource as at 30 June 2025 is as described in last published full Mineral Resources Estimate conducted by Measured Group 15 May
2023. The movement in the Mt Carbine Mineral Resource and Ore Reserve estimates between 30 June 2025 and 30 June 2026 is due to mining
depletion only. There has been no material change to the Mineral Resource or Ore Reserve models, or to the assumptions and technical parameters
underpinning the estimates, other than depletion arising from mining and processing during the period.
2 Totals may not add up due to rounding.
3 The tonnes depleted for the actual mining have been calculated using block model depletion and regular topographic surveys, to which density
factors have been applied to derive tonnes. These density factors are the same as described in the Ore Reserve report referenced in footnote 1.
4 The Ore Reserve is the economically mineable part of the Measured and Indicated Mineral Resource. It includes allowance for ore losses and dilution
during mining extraction.
5 The Company ensures that the Mineral Resource and Ore Reserve estimates quoted are subject to governance arrangements and internal controls at
both a site level and at the corporate l