Vale S.A. 6-K/ACurrent Reports (8-K / ad hoc)

Period 2026-06-30 · filed 2026-08-24

Source document

Loading document…
KPIsSections10
Balance Sheet
Balance Sheet
MetricValueFlag
Total Assets$89.28BGREEN
Total Equity$38.01BGREEN

Sections in this filing

Business

Business % ownership December 31, 2025 Equity results in income statement Dividends declared Translation adjustment Fair value remeasurement Others June 30, 2026 Associates and joint ventures In Brazil Anglo American Minério de Ferro do Brasil S.A. Iron ore 15.00 649 23 – – – – 672 Aliança Geração de Energia S.A. Energy 30.00 240 9 ( 13 ) – – 6 242 Aliança Norte Energia Participações S.A. Energy 51.00 66 ( 5 ) – 4 – – 65 Companhia Coreano-Brasileira de Pelotização Pellets 50.00 88 8 – 5 – – 101 Companhia Hispano-Brasileira de Pelotização Pellets 50.89 44 2 ( 2 ) 4 – – 48 Companhia Ítalo-Brasileira de Pelotização Pellets 50.90 75 3 – 5 – 2 85 Companhia Nipo-Brasileira de Pelotização Pellets 51.00 157 13 – 10 – 5 185 MRS Logística S.A. Logistics 49.01 804 49 ( 34 ) 48 – – 867 Samarco Mineração S.A. (note 23) Pellets 50.00 – – – – – – – VLI S.A. Logistics 29.60 410 20 – 25 – 2 457 Others – – 60 ( 4 ) – 4 28 2 90 Abroad PT Vale Indonesia Tbk Vale Base Metals 33.88 1,842 40 ( 15 ) ( 2 ) – – 1,865 Vale Oman Distribution Center Logistics 50.00 594 21 ( 28 ) – – – 587 5,029 179 ( 92 ) 103 28 17 5,264 Other results in associates and joint ventures ( 43 ) Equity results and other results in associates and joint ventures 136 Field: Page; Sequence: 49 Field: Sequence; Type: Arabic; Name: PageNo 47 Field: /Sequence Field: /Page 27. Acquisitions and divestitures Effects on the income statement Schedule of effects on the income statement Three-month period ended June 30, Six-month period ended June 30, Notes 2026 2025 2026 2025 Aliança Geração de Energia S.A. 27(a) – – – ( 117 ) – – – ( 117 ) a) Divestment of Aliança Geração de Energia S.A. (“Aliança”) – In March 2025, the Company signed an agreement with Global Infrastructure Partners for the sale of 70% of its stake in Aliança, including the operations of Sol do Cerrado solar plant and Risoleta Neves hydroelectric plant. As a result, the related assets and liabilities were classified as held for sale, and Vale recognized an impairment loss in the amount of US$ 117 in the income statement of the three-month period ended March 31, 2025, as "Impairment and other results related to non-current assets, net". The transaction was completed in September 2025, when Vale lost control over Aliança, with the remaining 30% interest being accounted for as an investment in an associate using the equity method. b) Thompson Operations, C