Companies/AU/FMG

FORTESCUE LTD

Last · ASXA$15.02-0.30 (-1.96%)live · yahoo · 1h ago
Vol 9.54M ≈ 143.25M
Market capA$46.2B3.08B sh
P/E · TTM11.0fwd 15.0 · eps 1.37
Beta0.69vs S&P 500
Div yield4.88%annual · TTM
52w range
A$15.01A$23.38
Volume9.5Msession

Issuer

Legal nameFORTESCUE LTD
HQAustralia (AU)
ListingAU FMG
ISINAU000000FMG4 +2
SectorMaterials
IndustryIron & Steel
CurrencyAUD
Entity registrylei:529900VEJFORCO6I4826
Employees15,745
AddressFortescue Ltd. 87 Adelaide Terrace 6004, East Perth +61 8 6218 8888
Headline financial metrics
RevenueA$17.0B
Operating incomeA$8.6M
Net incomeA$3.5M
Operating margin0.1%
Net margin0.0%
Return on equity0.0%
Loading chart…

OpenFilings analyst

Our analyst

Agentic read of the latest earnings call — recommendation updates when we process a new transcript. Research synthesis, not investment advice.

Excellent cash generation is offset by execution risk and insufficiently quantified growth returns.

Latest call · FY 2026

Hold: FY26 revenue rose 9% to US$17 billion, underlying EBITDA rose 9% to US$8.6 billion, and free cash flow rose 25% to US$3.2 billion, supported by US$0.9 billion of net debt and 65% dividend payout. The balance sheet and low-cost iron ore franchise are compelling, but Iron Bridge remains heavily fixed-cost and loss-making during ramp-up, while FY27 capex rises and the Green Grid, green metals and data-centre upside remains largely uncontracted.

Themes
  • Iron Ore
  • Iron Bridge
  • Green Grid
  • Decarbonisation
  • Capex
  • Cmrg Negotiations
+1

Near term

CMRG negotiations remain unresolved; management says inventory is normal but cannot rule out future shipment or pricing disruption.

FY27 sustaining and hub development capex is guided at US$2.3 billion to US$2.7 billion, including a peak period for grey-fleet replacement and port maintenance.

Iron Bridge is about 70% fixed cost and management intends to keep ramping it despite the history of cash losses.

Longer term

The core iron ore business retains a strong cost position, with 201.3 million tonnes shipped and US$18.74/t hematite C1 cost in FY26.

The Green Grid and electrification program could lower operating costs and create third-party power revenue, but customer offtake and returns are not yet quantified.

Blacksmith is planned for production by the end of the decade and is intended to support the product strategy, but its contribution remains several years away.

Red flags

Management did not quantify Green Grid offtake, customer signings, project economics or expected ROCE despite repeated analyst questions.

Iron Bridge has a 70% fixed-cost structure during ramp-up, leaving limited downside protection if volumes or performance disappoint.

The call disclosed 69 alleged breaches, including 29 related to discrimination and harassment, and 11 dismissals; an executive investigation remains ongoing while the executive has not been stood down.

Recommendation history

OpenFilings analyst view from primary-source filings and earnings calls — not investment advice.

From latest ANNUAL · 2026-08-19

  • Net Margin Sharply Negative

Red flags

  • Net Margin Sharply Negative — Net margin -2918.4%

Earnings transcripts

12 of 47 recent

Documents